Lantronix Printer LPS1-T Manual de usuario Pagina 13

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 74
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 12
Installation Installing the MPS
2-3
5 Allow 45 seconds for the unit to fully boot. The LINK LED will be lit if there is a
valid network connection. The ACT LED gives information about what the MPS is
doing; for example, when code is being downloaded as the unit boots, the LED will
blink green quickly. If you have connected a 100BASE-T cable (MPS100 only), The
Link and 100MBit LEDs should both be solid green. If not, check your network con-
nection.
6 Print a Test page by pressing the Test/Reset button.
Note: If the Power LED does not light or the Test page does not print, refer
to Appendix B.
Vista de pagina 12
1 2 ... 8 9 10 11 12 13 14 15 16 17 18 ... 73 74

Comentarios a estos manuales

Sin comentarios